Contents of the Inspection Process Kit _copyright-and-license-agreement.doc control-of-nonconformances-procedure-rev-orig.doc corrective-and-preventive-action-procedure-rev-orig.doc dimensional-analysis-rev-orig-138.doc dimensional-analysis_first-piece-inspection-report-138.doc engineering-order-350.doc failure-analysis-report-144.doc inspection-instruction-149.doc inspection-process-procedure-rev-orig-37-73-281.doc inspection-record-150.doc inspection-report-151.doc inspection-summary-432.doc investigation-and-corrective-action-request-400.doc nonconformance-report-form-2-rev-orig-4-1434.doc nonconformance-report-form-rfs-rev-orig-9-1432.doc qc-tags-177.doc receiving-inspection-procedure-rev-orig-628_630.doc request-for-corrective-action-188.doc request-for-deviation-waiver-189.doc request-for-variance-dd1694-apr2017-complementary.doc supplier-rating-in-production-204.xls trend-chart-nonconformance-rev-orig.xls trend-chart-yield-rating-product-grand-avg-rev-orig.xls trend-chart-yield-rating-product-individual-rev-orig.xls validation-verification-form-rev-orig-588.doc xbar-216.xls yield-chart-217.xls Tech support from the Quality Manager Toolbox is no charge by phone and email and has no expiration.